2MW HEATING & HOT WATER TURNKEY SOLUTION PACKAGE TO LARGE LEISURE PARK IN RECORD TIME

Challenge
A major North West leisure centre needed a hire solution to enable the upgrade of existing vital heating and hot water services.
The key challenge was ensuring that the solution was installed and commissioned within a very short timeframe whilst the park was open to the public. This involved conducting a site survey at short notice to help confirm requirements ensuring the project could be delivered within the timeframe required.
Solution

All sites surveyed at short notice , same day turnaround

Temporary system designed, utilising existing store & AHU systems to reduce risk

Large duty heaters in small footprint utilised to save space

Complete fuel management package utilising telemetry

Benefits

Turnkey package delivered – reducing client touch points

Dedicated project manager ensured the job was completed on time with seamless handover

Works conducted out of hours to minimise down time

Fuel remote monitoring to provide increased system resilience