Urgent call followed by quick response saves MRI Scanner shutdown
![case study-NHS MRI scanner](https://allseasonshire.com/app/uploads/2020/07/case-study-NHS-MRI-scanner.jpg)
Challenge
All Seasons Hire received an urgent call for help late on Friday afternoon after a leading Edinburgh Clinic’s chiller failed, they desperately required a temporary replacement.
The team quickly jumped into action and by midday Saturday a 50kw chiller had been delivered to site, installed and commissioned. The fast response enabled the clinic to stay on schedule and allow this multi-million pound vital piece of equipment to carry on with its invaluable work.
Solution
![tick](https://allseasonshire.com/app/themes/all-seasons-hire/images/icons/tick.png)
Client needed same day site survey to enable next day system installation
![tick](https://allseasonshire.com/app/themes/all-seasons-hire/images/icons/tick.png)
Small footprint chiller & Generator package provided
![tick](https://allseasonshire.com/app/themes/all-seasons-hire/images/icons/tick.png)
Telemetry system installed complete with fuel management
![tick](https://allseasonshire.com/app/themes/all-seasons-hire/images/icons/tick.png)
Utilised existing pipe connections to speed up installation
![NHS-logo-small](https://allseasonshire.com/app/uploads/2020/07/NHS-logo-small.png)
Benefits
![tick](https://allseasonshire.com/app/themes/all-seasons-hire/images/icons/tick.png)
Same day response to reduce impact to client appointment schedules
![tick](https://allseasonshire.com/app/themes/all-seasons-hire/images/icons/tick.png)
Turnkey solution offered to client to minimise time scales
![tick](https://allseasonshire.com/app/themes/all-seasons-hire/images/icons/tick.png)
Client able to remotely monitor the equipment’s operation
![tick](https://allseasonshire.com/app/themes/all-seasons-hire/images/icons/tick.png)
Onsite disruption kept to a minimum during installation
![case study-NHS MRI scanner 2](https://allseasonshire.com/app/uploads/2020/07/case-study-NHS-MRI-scanner-2.jpg)