01264 387370

2MW HEATING & HOT WATER TURNKEY SOLUTION PACKAGE TO LARGE LEISURE PARK IN RECORD TIME

case study-IMTECH-Sandcastle

Challenge

A major North West leisure centre needed a hire solution to enable the upgrade of existing vital heating and hot water services.

The key challenge was ensuring that the solution was installed and commissioned within a very short timeframe whilst the park was open to the public. This involved conducting a site survey at short notice to help confirm requirements ensuring the project could be delivered within the timeframe required.

Solution

tick

All sites surveyed at short notice , same day turnaround

tick

Temporary system designed, utilising existing store & AHU systems to reduce risk

tick

Large duty heaters in small footprint utilised to save space

tick

Complete fuel management package utilising telemetry

case study-turnkey solutions

Benefits

tick

Turnkey package delivered – reducing client touch points

tick

Dedicated project manager ensured the job was completed on time with seamless handover

tick

Works conducted out of hours to minimise down time

tick

Fuel remote monitoring to provide increased system resilience

case study-IMTECH-van

More Posts

Get more information and stay informed

Contact us directly on 01264 387370 or email us on info@allseasonshire.com. Alternatively fill out the box to the right and we will send you more Information.