Putting Bubbles into Soft Drinks Production

drinks-manufacturing-(web-opt)

Challenge

A multinational soft drinks manufacturer needed to increase bottling capacity to meet demand last summer.  A combination of national lockdown and a warm summer meant that consumption of their world famous brand grew three fold. To ensure the product held its fizz it was cooled to five degrees before being bottled, then injected with CO2.

All Seasons Hire achieved this by supplying a 500kW chiller, a stainless steel heat exchanger, WRAS approved pump set and generator. The temporary system was designed by one of our process cooling technicians and All Seasons Hire managed every aspect of the installation ensuring production could be increased quickly with minimum disruption.

Solution

tick

Chiller packages from 10kW to 1mW available for immediate despatch

tick

Site surveys and technical surveys carried out by industry leading experts

tick

Full turnkey installations with bespoke solutions, including power

tick

24/7 availability and 365 service back up

tick

Fully project managed installations and on-going site supervision with remote monitoring and fuel management options

turnkey_solutions

Benefits

tick

Quick seamless installations with minimal loss of production

tick

Peace of mind from our “Right FirstTtime” philosophy

tick

Full turnkey capabilities with a single point of contact

tick

Remote monitoring gives visibility of operation 24/7