All Seasons Hire Cool Down Production with an Extra Strong Solution
Challenge
When a well-known confectionery company called All Seasons Hire for help, we needed to act fast. Production had ground to a halt as the main air-conditioning system had failed which meant that the product didn’t set properly and was too sticky to go into the packaging hall.
With product backing up inside Europe’s biggest mint production facility, we devised a fast solution that blew chilled air directly onto the product with ventilation to remove excess heat from the area. The entire project, from initial site survey to installation took less than 24 hours. We utilised their specialist mono-block air conditioning units to deliver chilled air directly onto the production line which meant that a costly bill to cool the entire area was averted.
Solution
Process air-conditioning units from 4kW to10kW
Fast site and technical surveys carried out by industry leading experts
Full turnkey installations with bespoke solutions, including power
24/7 availability and 365 service back up
Fully project managed installations and ongoing site supervision
Benefits
Quick seamless installations with minimal loss of production
Peace of mind from our “right first time” philosophy
Full turnkey capabilities with a single point of contact
Same day response minimising production down time