All Seasons Hire Cool Down Production with an Extra Strong Solution

Challenge
When a well-known confectionery company called All Seasons Hire for help, we needed to act fast. Production had ground to a halt as the main air-conditioning system had failed which meant that the product didn’t set properly and was too sticky to go into the packaging hall.
With product backing up inside Europe’s biggest mint production facility, we devised a fast solution that blew chilled air directly onto the product with ventilation to remove excess heat from the area. The entire project, from initial site survey to installation took less than 24 hours. We utilised their specialist mono-block air conditioning units to deliver chilled air directly onto the production line which meant that a costly bill to cool the entire area was averted.
Solution

Process air-conditioning units from 4kW to10kW

Fast site and technical surveys carried out by industry leading experts

Full turnkey installations with bespoke solutions, including power

24/7 availability and 365 service back up

Fully project managed installations and ongoing site supervision

Benefits

Quick seamless installations with minimal loss of production

Peace of mind from our “right first time” philosophy

Full turnkey capabilities with a single point of contact

Same day response minimising production down time