Challenge
All Seasons Hire received an emergency call from a North West University; their district heating had failed and was looking at lengthy delays in receiving the parts required to repair it. The University were potentially facing several weeks of no heating to their campus.
All Seasons Hire visited campus that evening, and designed a way to connect a temporary boiler package to the existing district heating system. A timeframe and enabling works were agreed for us to begin work immediately.
Solution
Site survey carried out within two hours to understand and create a project plan.
Risk assessment and method statement with detailed project information and required enabling works submitted to client.
Two 1.2mW Boilers delivered, lifted, installed and commissioned within allocated timeframe.
Fully project managed from inception to handover.
Benefits
Full turnkey solution to reduce lead-time and minimise downtime.
Highly experienced installation team, worked throughout the day to ensure that the system was ready for connection the following day.
Nationwide fast response times to ensure campus critical equipment is kept operational.
Remote monitoring helped build resilience ensuring a pro-active approach to any issues which may occur.