EMERGENCY PROCESS COOLING SOLUTION FOR LEADING PHARMACEUTICAL MANUFACTURER

pill_manufacturing

Challenge

All Seasons Hire were contacted by a leading national Facilities Management company, when their clients process cooling system suffered a catastrophic failure. The system was used in one of the UK’s largest pharmaceutical factories to cool clean rooms, packaging areas and manufacturing process areas. This caused the factory to close during a peak production period and therefore an urgent solution was needed fast.

The key challenge was ensuring that the solution was installed and commissioned within an extremely short period of time to enable the re-start of production. This involved conducting an out of hours site survey on the same day ensuring the project could be delivered overnight and up and running the next day.

Solution

tick

Technical team onsite within 2 hours to understand and design a solution

tick

Equipment dispatched same evening to ensure a fast turnaround

tick

Communications were handled completely by the Project manager to ensure alignment and key timings were met

tick

Complete turnkey package delivered, including 2mW power generation and all enabling works

tick

Complete fuel management utilising secure telemetry

case study-turnkey solutions

Benefits

tick

Onsite solution in place within 24 hours of the first call ensuring production was up and running with minimal downtime

tick

Full managed turnkey service with full specification & installation providing seamless solution

tick

Downtime costs reduced to a minimum by out of hours installation, 24/7 engineering and technical support

tick

Onsite disruption kept to a minimum during installation

500kW_chillers