Challenge

A large UK milk producer called All Seasons Hire with a problem. One of its sites had a chiller failure on a pasteurisation line, without which the dairy couldn’t operate. The site had used All Seasons Hire previously to overcome high cooling tower temperatures in the summer; so they knew exactly who to call when the failure occurred.  The chiller served a dual-pass plate heat exchanger, with a cooling tower on the first pass, the chiller needed to take the milk from thirty degrees to five degrees.

Fortunately, the site had taken our advice in the summer and during shutdown installed pipe connections should this scenario ever happen. A 500kW chiller was installed within 24 hours of the breakdown. All Seasons Hire provided a full turnkey service including generator, fuel and additional Glycol. The installation caused minimal disruption and averted thousands of litres of milk going to waste.

Solution

tick

Large range of process chillers available from stock nationwide

tick

Food grade glycol held in stock

tick

Fast reliable delivery service with nationwide coverage

tick

24/7 availability and 365 service back up

tick

Equipment provided by UK’s largest cooling specialist

turnkey_solutions

Benefits

tick

Quick seamless installations with minimal disruption to production

tick

Peace of mind from our “right first time” philosophy

tick

Our depot network ensures we can provide same day deliveries if required

tick

Clean, modern, reliable fleet from the UK’s cooling experts

500kw Chiller

More Posts

Get more information and stay informed

Contact us directly on 01264 387370 or email us on info@allseasonshire.com. Alternatively fill out the box to the right and we will send you more Information.