Challenge
All Seasons Hire received an urgent call for help late on Friday afternoon after a leading Edinburgh Clinic’s chiller failed, they desperately required a temporary replacement.
The team quickly jumped into action and by midday Saturday a 50kw chiller had been delivered to site, installed and commissioned. The fast response enabled the clinic to stay on schedule and allow this multi-million pound vital piece of equipment to carry on with its invaluable work.
Solution

Client needed same day site survey to enable next day system installation

Small footprint chiller & Generator package provided

Telemetry system installed complete with fuel management

Utilised existing pipe connections to speed up installation

Benefits

Same day response to reduce impact to client appointment schedules

Turnkey solution offered to client to minimise time scales

Client able to remotely monitor the equipment’s operation

Onsite disruption kept to a minimum during installation